The examples are illustrative. Confirm the scope and permissions for your project.
This distinction appears in supplier documentation. SOFTSWISS describes an integration process in which it provides documentation and validates an integration while the operator develops the integration code. That is the vendor's description of its own process. It establishes no arrangement with Growmoon. SOFTSWISS Game Aggregator
Assign each supplier and integration responsibility
Fill in the table using the supplier’s terminology and written agreement. It is a procurement worksheet. Confirm who actually accepts each responsibility before comparing proposals.
| Role | Detail to record | Evidence to request |
|---|---|---|
| Content supplier or intermediary | Exact contracted scope and recipient | Matching agreement and permitted offering |
| Platform owner | System receiving the integration | Named technical counterpart and interface version |
| Integration developer | Connector changes and acceptance work | Deliverable list and authorized test plan |
| Operations contact | Incident, reconciliation and change handling | Contact path and agreed service boundaries |
For every proposed provider or title, record the permitted product, intended use, recipient and restrictions. Ask who keeps that list current. A visible logo or catalogue screenshot should lead to a verification question; it should not become the buyer's evidence of entitlement.
Keep an unknown entry explicit until the responsible counterparty resolves it. The buyer can still prepare an interface review or responsibility worksheet while a commercial permission remains unresolved.
Review the API contract and test environment
Record the protocol version, environment and authorized method of obtaining documentation. Identify who controls test credentials, configuration changes and acceptance. Keep credentials out of procurement documents and screenshots.
Then ask the parties to define observable behavior for the events included in the chosen protocol. Depending on scope, the questions may concern session creation, accepted events, repeats, interruptions, reversals and reconciliation. A generic connector example cannot settle the behavior of an upstream provider that has not been tested.
Use the following fictional case to compare proposals. It is deliberately protocol-neutral and has not been executed.
| Situation | Agreed question | Record needed for acceptance |
|---|---|---|
| Event E-001 receives an accepted response | What operation was accepted? | Matching operation reference and final state |
| E-001 arrives again | What counts as a repeat? | Defined duplicate outcome and record count |
| Response is lost | How is status reconciled before another attempt? | Original reference, lookup result and next action |
| An event is rejected | Who corrects the cause? | Reason, responsible party and recovery decision |
Ask the engineering counterpart to replace these questions with the actual protocol rules. Mark unsupported cases. The record should show what happened and what remains uncertain.
Compare fees and operating responsibilities
List setup, connector development, recurring service, usage or revenue-linked units separately where they apply. Record the currency, calculation basis, minimum commitment and third-party payer. Leave unknown figures blank rather than copying a competitor's quote.
Agree the hours and channel for incidents. Who investigates a mismatch? Who can suspend a failing connection? Who communicates an upstream change? A support label becomes useful when it identifies the responsible party, the covered work and the escalation route.
Include exit questions before starting: which records can be exported, which credentials must be revoked, and what happens to ongoing access when the arrangement ends? Ask for the permitted format and handover owner.
Confirm permissions and release requirements for each market
Maintain separate project rows for the United States, United Kingdom and Australia. Record the proposed recipient, product and intended use, then assign qualified assessment of that scope. Country targeting for a B2B website does not establish permission to supply a particular casino product.
Take the completed role table to a casino API scope discussion. If the requirement concerns building a connector for a supplier the buyer already has, also review the separate API development service. Keep supplier access, engineering acceptance and production release as individually evidenced decisions.
