The examples are illustrative. Confirm the scope and permissions for your project.
For example: “Commission a browser prototype that shows our original round flow with fixed demonstration outcomes.” This fictional request can be reviewed through screen states and recorded transitions. An operator integration would need a separate, agreed interface and authorized test context. Keep those boundaries visible while comparing proposals.
Name the owner of each game component
Give each included component one row with its input, expected output and owner. Flag an unassigned component as an unresolved dependency before comparing estimates.
| Component | Question for the proposal | Evidence to request |
|---|---|---|
| Rules and mathematical design | Who provides the approved rules, versions and changes? | Dated specification and named approver |
| Client and assets | Which screens, devices and editable files are included? | Screen inventory and asset manifest |
| State and integration | Who owns the authoritative record and external interface? | Interface version and responsibility table |
| Assessment and operations | Who decides readiness for the intended use? | Assigned reviewer, evidence list and exclusions |
Treat source access, permission to modify, permission to distribute and ownership as separate fields to resolve in the agreement. Ask how third-party libraries and artwork affect the proposed handover. Avoid assuming that a build file includes editable assets or that a source archive establishes every right the buyer needs.
Document the states in one complete round
The following is an original scoping example. It defines a proposed fixture, rather than reporting a working game or a supplier protocol.
| Fictional event | Proposed state | Question to settle |
|---|---|---|
| Open round R-001 | Ready | Which actor may open it? |
| Submit fixed demonstration input | In progress | Which version of the rules applies? |
| Record fixed demonstration result | Completed | What record proves completion? |
| Repeat the same event identifier | Previously recorded result | How is a duplicate recognized? |
| Interrupt before completion | Pending recovery | Who determines the next permitted action? |
Ask the developer to turn the agreed rows into expected and actual records. Include an invalid transition, such as a completion event received before a round exists. State whether the expected response is rejection, recovery or an explicit unsupported case. Record the limitation if a prototype cannot restore a session.
This worksheet helps a buyer see what a demonstration would establish. It cannot establish fairness, production security, supplier compatibility or permission to operate. Those claims need their own evidence and appropriate review.
Set different checks for a prototype and a production build
For a prototype, acceptance might be a reviewed screen inventory and repeatable fixture walkthrough. For a component, ask for a reproducible build, the declared interface, failure cases and setup instructions. A production proposal should identify the exact product, recipient, intended use and deployment responsibilities for qualified assessment.
For projects intended for the United States, United Kingdom or Australia, keep a separate row for each proposed jurisdiction and distribution route. Assign someone qualified to assess the concrete scope. A shared English-language page or a supplier's market statement does not settle project eligibility.
App distribution adds another review. Apple publishes separate provisions for gaming and gambling in its current App Review Guidelines. Check the provisions against the actual proposed app and its distribution plan before accepting a release promise. This worksheet provides no approval or legal conclusion. Apple App Review Guidelines
Check the handover before accepting the final milestone
Specify the source revision, build instructions, configuration ownership, editable assets and dependency licences. Identify which test records belong to that revision. Ask the receiving engineer to list missing setup inputs before acceptance.
Commercial comparison should show development units, external assessment costs, infrastructure and aftercare separately. Name the person who receives a defect report and the process for changes to rules or external interfaces. Leave amounts, staffing and dates unresolved until the responsible parties supply them.
Bring the completed component table and one round worksheet to a casino game development scope discussion. The first useful decision is which deliverable can be estimated and accepted with the evidence available.